Heizen

Acme Industrial Systems

Industrial components manufacturing · 11 countries · 2 plants

Discovery conversationThursday 20 August 2026, 15:00 IST· 45 minutes

Sources

What we read, and what it gave us

10 of 10 shown

The source ledger. Every citation in this project points at one of these, and each shows what was extracted from it — or that nothing was.

  • filing12 March 2026High strength

    Annual Report FY2026

    Acme Industrial Systems — Investor Relations · retrieved 14 August 2026

    “During FY2026 we established distribution and assembly operations in three additional regions — Vietnam, Mexico and Poland — bringing our operating footprint to eleven countries.”

    Extracted from it

    • SIGNALRegional expansion has outpaced the operating model86%
    • SIGNALHeadcount is absorbing the coordination load78%

    2 facts · 2 signals

    Questions it produced

    Open source ↗ (new tab)
  • earnings call24 July 2026High strength

    Q1 FY2027 earnings call transcript

    Acme Industrial Systems · retrieved 14 August 2026

    “Our planning cycle has lengthened as we have added regions, and we are carrying more inventory than we would like while we work through that.”

    Extracted from it

    • SIGNALThe planning cycle is lengthening as regions are added94%

    1 fact · 1 signal

    Questions it produced

    Open source ↗ (new tab)
  • job posting21 May 2026High strength

    SAP S/4HANA Integration Lead

    LinkedIn Jobs · retrieved 14 August 2026

    “Lead the functional and technical migration from SAP ECC 6.0 to S/4HANA across eleven country entities, including harmonisation of material and vendor master data.”

    Extracted from it

    • SIGNALERP modernisation is live and mid-flight91%

    1 fact · 1 signal

    Questions it produced

    Open source ↗ (new tab)
  • job posting3 June 2026High strength

    Regional Supply Planning Manager — Guadalajara

    Acme Industrial Systems — Careers · retrieved 14 August 2026

    “Consolidate regional demand plans submitted in Excel and reconcile against the central S&OP plan ahead of the monthly review.”

    Extracted from it

    • SIGNALRegional planning runs on spreadsheets outside the system88%
    • SIGNALHeadcount is absorbing the coordination load78%

    1 fact · 2 signals

    Questions it produced

    Open source ↗ (new tab)
  • job posting9 July 2026High strength

    Supply Chain Data Analyst — Pune

    Acme Industrial Systems — Careers · retrieved 14 August 2026

    “Maintain the planning workbooks used by the regional planning teams and prepare the weekly variance pack for the COO.”

    Extracted from it

    • SIGNALRegional planning runs on spreadsheets outside the system88%
    • SIGNALHeadcount is absorbing the coordination load78%

    1 fact · 2 signals

    Questions it produced

    Open source ↗ (new tab)
  • news28 January 2026Medium strength

    Acme opens Poland distribution hub, drops distributor model

    Industrial Logistics Weekly · retrieved 14 August 2026

    “The Poland facility will serve European OEM customers directly, replacing a distributor arrangement Acme has used since 2019.”

    Extracted from it

    • SIGNALRegional expansion has outpaced the operating model86%

    1 fact · 1 signal

    Questions it produced

    Open source ↗ (new tab)
  • review17 February 2026Low strength

    Employee review — Supply Planning, Pune

    AmbitionBox · retrieved 14 August 2026

    “Every Friday goes on reconciling the regional files. The system does not talk to the regional sheets so we re-key most of it.”

    Extracted from it

    • SIGNALRegional planning runs on spreadsheets outside the system88%
    • SIGNALThe reconciliation work is visible to the people doing it62%

    1 fact · 2 signals

    Questions it produced

    Open source ↗ (new tab)
  • case studyNovember 2024Medium strength

    Acme Industrial standardises warehouse execution

    Manhattan Associates · retrieved 14 August 2026

    “Acme deployed Manhattan Active Warehouse Management across its two Indian plants, replacing paper-based picking.”

    Extracted from it

    • SIGNALWarehouse execution is already modernised83%

    1 fact · 1 signal

    Questions it produced

    Open source ↗ (new tab)
  • profileUpdated June 2026Medium strength

    Priya Raghavan — Chief Technology Officer

    LinkedIn · retrieved 14 August 2026

    “Chief Technology Officer at Acme Industrial Systems. Previously Head of Enterprise Architecture at a listed engineering group. Currently leading the S/4HANA programme.”

    Extracted from it

    • SIGNALERP modernisation is live and mid-flight91%

    1 fact · 1 signal

    Questions it produced

    Open source ↗ (new tab)
  • profileUpdated April 2026Medium strength

    Anand Kulkarni — Chief Operating Officer

    LinkedIn · retrieved 14 August 2026

    “Chief Operating Officer, Acme Industrial Systems. Nineteen years in plant and supply chain operations. Accountable for the international expansion programme.”

    Extracted from it

    Read, nothing extracted. A source that produces nothing is a normal outcome, not a failure.

    1 fact · 0 signals

Prototype: source URLs resolve to example.com domains and will not load. Everything else on the card — type, dates, excerpt, extraction — is what a real ledger row would carry.

Prepared for Technical Consultant meeting CTO. 0 questions on the agenda.